All simulation examples

Illustrative study — supplied sample content. The scenario, simulation visuals and numerical results below are examples supplied for this website. They are not independently verified IMBEST project results, client endorsements or performance guarantees. Method, feasibility and delivery scope must be confirmed for each enquiry.
AIV/FIV Screening of a High-Pressure Gas Piping System
Screening small-bore connections downstream of a pressure-letdown station and closing a resonance risk with targeted reinforcement.
01 — ChallengeUnscreened small-bore connections near a letdown station
Piping downstream of a pressure-letdown station had not been screened for Acoustic-Induced Vibration (AIV) or Flow-Induced Vibration (FIV) risk against Energy Institute guidelines, leaving an unknown fatigue exposure at small-bore connections.
02 — ApproachCombined acoustic screening and modal FEA
Acoustic power level screening per EI guidelines identified high-risk connections, which were then carried into modal FEA to check natural frequency against the excitation band from compressor harmonics.
03 — Simulation ResultDynamic amplification vs. frequency, before/after
Dynamic amplification vs. frequency, before/afterFig. 1 of 1
04 — Quantified ResultsBefore / After
| Parameter | Baseline | Result | |
|---|---|---|---|
| Connections in “high likelihood of failure” zone | 4 identified | → | 0 after reinforcement |
| Natural frequency vs. excitation band | within 15% | → | +38% shifted clear |
| Fatigue life at critical weld | <2 years | → | >20 years |
05 — Business Impact
Prevented a probable high-cycle fatigue failure of a type that causes unplanned shutdowns in comparable systems.